MAG 90
1993 | Spain Costa Blanca
790 000 € incl vat
Main datas
- Builder : Mag France
- Price : 790 000 €
- Material : Aluminum
- Year : 1993
- Length : 27,43 m
- Beam : 6,70 m
- keel : Fixed Keel
- Draft minimum : 3,70 m
- Hull : Monohull
- Life Raft : Yes
- Area : Spain Costa Blanca
- Mooring : No
- Leasing in progress : No
- Flag : Spain
- Subtype : Pleasure, Fast
- Architect : Bouvet Petit Flahaut
Engines
- Brand : VOLVO PENTA
- Model : D4-270-G
- Fuel : Diesel
- Montage : In Board (IB)
- Engine(s) : 1
- Power Unit. (CV) : 270
- Hours : 15
- Drive : Shaft drive
- Fuel capacity : 3000
- Owner's Comments : New generation engine installed by Volvo professionals in 2020/07
Facilities
- Double Cabin : 4
- Sailor Cabin : 2
- Head : 5
- Berth : 10
- Helm : No
- WC : Electric
Major equipment
- Bow Thruster : Yes
- Stern thruster : No
- Marine Gen. : Yes
- Group and thruster details : Generator sets Generator 1: ONAN 22KW Model MDKBS-57441 rebuilt in 2019 Disassembled and completely revised, changed the soundproofing and repainted, being like new, installed in 2020. Generator 2: Wisper Power 8KW Model M-6V10K, new 2019
- AC : No
- Charger and AC details : New service batteries, a total of 62 2v / 450A vessels, installed in 2020. Engine batteries and generator (2) changed in 2020. VICTRON brand solar panels, installed in October 2019, new. VICTRON 100Ah brand battery chargers (3), revised. Inverters (2) Master-volt 24 / 220v, revised in 2020.
- Hot water : Yes
- Black Water : Yes
- Tender : Yes
- Details : Annex with 40 HP Suzuki HB engine (new 2019)
- Tender Engine : Yes
Electronics
- Radar : Yes
- Radar details :
- VHF : Yes
- Converter 12/220 : Yes
- Sounder : Yes
- Sounder details :
- GPS : Yes
- Chartplotter : Yes
- Plotter details :
- Autopilot : Yes
- Pilot details :
- Watermaker : Yes
- Watermaker details : Water treatment plants SEA RECOVERY 2X 160 liters serviced and repaired by the brand itself in 2020.
Bridge equipment
- Gangway : Yes
- Hydrolic Gangway : No
- Davits : Yes
- Bath platform : Yes
- Electric windlass : Yes
- Cockpit awning : No
- Sprayhood : Yes
- Teak cockpit : Yes
- Furling genoa : Yes
- Furling mainsail : No
- Spinnaker : Yes
- Sails details : Voiles et gréement: Gréement revu par des professionnels en 2020. Nouveau système de bastaques monté en 2020. L’ensemble des voiles ont été lavées et révisées par des professionnels Quantum en 2020 Toutes les voiles ont été mesurées et certifiées pour ORC / IRC 1-Grand Voile à 75% et nouvelles lattes 2020.Trinquette à 80% 3- Génois médium à 80% 4-Code 0 à 60% 5-Gennaker 1 à 80% 6-Gennaker 2 à 80% 7- Voile de cape neuve 2019 Drisse de grand-voile en dynema changée en 2020. Le profil de l’étai a été modifié et un nouveau a été installé en 2020. POULIES, ROULEAUX ET ROULEMENTS à billes ont été révisés et/ou changés en 2020
- Winter cover : No
- Mast : 1
- Teak deck : Yes
Appliances
- IceMaker : Yes
- Fridge : 2
- Dishwasher : Yes
- Washing machine : Yes
- TV antenna : Yes
- TV : Yes
- SAT-TV : No
- Heater : Yes
- Heating details : Air conditionné CLIMMA 150000 BTU, révisé totalement par la propre Marque. De nouveaux fan-Coils ont été rajoutés dans la zone des couchettes d’équipage, de la cuisine et salle des machines en 2020.
- Freezer : Yes
- Oven : Yes
- Microwaves : Yes
- Electric stove : Yes
- Gas stove : Yes
Owner's comments
-
Price reduced for a quick sale.
Water: 3400 liters
Fuel: 3000 liters
Motor rotation speed: 2800 MN
All fresh water and diesel tanks were overhauled and cleaned in 2020
The crew cabins as well as the common area have been remodeled and repainted to create a more comfortable area in 2020.
Installation of a new motor gimbal in 2020
New motor shaft installed in 2020
Propeller Max Prop.
Engine room :
140 liter buffer tank system dismantled and overhauled in 2020.
Manual and automatic filling systems new in 2020
There is a purifying diesel filter before filling the buffer tank which automatically fills it, model CJC, which purifies and cleans the fuel, thus ensuring that the engine buffer tank is always full of clean and dry diesel.
Second electric fuel filler pump, for auxiliary use in 2020
Third manual filling pump maintained and installed.
New Catheco anode system November 2019
Currently, the Cathelco plant is also being changed, which we expect to receive and install soon, so that all the diesel purification systems are new.
New engine room ventilation system installed in 2020
Electricity
Electrical work carried out by a specialized company and an engineer, (CONTROL MARINE SL)
Complete electrical rewiring on all lines, in 2020.
New electrical system with automation throughout the boat via PLC and HMI screen.
Motorization of:
- Energy control. - Energy distribution system; - Checking the holds. - Control and information on AC / DC circuits. - Navigation lights (all led). - Ventilation of the machine room. - Habitability circuits. - Chargers. - Fresh water pumps. - Gray water pumps. - Waste water pumps. - Watermaker and water treatment. - Exterior lighting and mast.
From a central screen, you can control the start-up of the autopilots and in general, all the electronics of the boat.
by leaving free a manual control option which cancels the PLCs by switching them to manual individually.
Quick 40 lts water heater, new 2020.
Lopolights 2020 dual LED navigation lights.
Installation of music equipment with external controller and BT, FUSION, in 2020
Painting.
BRAND OF PAINTS USED IN THE PAINT OF THIS AWL.GRIP BOAT
The hull was painted gray (Kingston Gray) October 2019
White painted deck and non-slip work surfaces, January 2020
Bôme park avenue blanche, in January 2020.
External cover of the exterior deck in teak restored completely to new in 2019.
Interior coverage:
Completely new when it comes to teak finishing in 2020.
Awnings, awnings and sun protection: Biminis, winch covers, steering wheel cover, mainsail cover and all upholstery have been refurbished in a very high quality black material in 2020
Interior padding
Change of the living room upholstery in a new ivory white color in 2020.
The mattresses of all cabins, including those of the crew were changed in October 2019. They have not been used since as the boat has only sailed in occasional sea trials lasting a few hours.
Hydraulic
All the hydraulic system hoses were changed in 2019.
All NAVTEC hydraulic rigging systems have been dismantled, returned for overhaul and general maintenance to a company specializing in hydraulic systems. They are being tested and repaired, 2020.
Navtec hydraulic pumps repaired, 2020.
The hydraulic tanks were dismantled and overhauled by changing each of the solenoid valves of the different services that exist on the ship in 2020.
Cooked
Kitchen cover in teak finish.
New appliances 2020: MIELE dishwashers. Large capacity refrigerators (2) 24 volts.
24 volt freezers (2). 1 Ice maker.
Repair and installation of the sink trash compactor in 2020.
MIELE washing machine - dryer, installed in the annex garage in 2019
In addition, the kitchen is commercial style entirely in stainless steel and equipped with Gagguenau appliances, such as a ceramic hob, steam oven, hob, microwave, extractor hood, etc.
Electronics 2020
B&G by the official installer.
HYDRA H5000 processor (1), 2020.
H5 5000 graphic display (3), 2020.
40/40 HV screens (4) on the mast, 2020.
B&G ZG-100 GPS antenna, 2020.
Vertical wind equipment 0.8M, 35M (115´) CBL, 2020.
DST800-D / S / T, 235 kHz. 2020
H5000 analog extension, year 2020.
B&G ZEUS 3-9 (2 UNITS), year 2020.
B&G ZEUS 3-16 (1 unit) on chart table, year 2020.
Radar B&G 4G BB (1 unit), year 2020.
C-Map cartography. 2020.
Pilot controller (2 units), year 2020.
HS60 satellite tower, year 2020.
Satlink Fleetone satellite communication equipment, year 2020.
Navigation compass (2 units), year 2020.
Garmin GPS plotter screens, (2 units), year 2020.
In addition to this equipment installed in 2020, the boat has others which are described below and which have been checked by a professional company: - Navigation center.
- Simrad C-80 plotter.
- ARPA / AIS- SIMRAD.
- Autopilot from two positions with double pump.
- Depth probe.
- Simrad VHF radio telephone.
- SSB radio telephone.
- Simrad SAT-COM with fax.
- Portable equipment GMDSS, SIMRAD RC-50. (2 units)
- SIMRAD portable probe equipment
- Portable radio equipment ICOM, IC-71. (1 unit)
- Portable radio equipment for the crew, ICOM BC-119N (3 units).
security
EPIRDE (1)
Fire pump installed in 2019.
Second piano valve pump which acts in the event of a bilge fire in 2020.
Zoned bilge system with individual pumps in 2019
New fire hoses 2019.
Revised Fire Fighting System 2019
New 2020 fire control panel changed by a specialist company.
Self-inflating life jackets were all revised in 2019. (12). SOLAS A Ocean liferafts (2 units) have also been revised in 2019.
Auxiliary boat (dingui)
Côtes 400 (1) and its new 40hp Suzuki HB engine in 2019. (0 hours)
Other
2020 painted carbon swim ladder.
Side access ladder painted in 2020.
Access ladder from the bridge to the swimming platform painted in 2020.
Custom carbon gangway repaired and painted in 2019.
Deck shower (3).
Rear sunbathing mat with new covers and covers without replacement, in 2020.
New replacement mats and covers, which were never used in 2020.
In addition, all rugs have been changed to terry cloth 2019.
Anchoring material
Electric windlass under MUIR deck, with a large anchoring stake with two 120m anchoring devices.
DANFORTH anchor anchor (2 units)
Completely overhauled bow thruster and new propellers in 2019.